Termination & Removal of Existing Services SWMS
Professionally Customised for Your Business
- Professionally customised for your business
- Your Logo and Business Details Included
- Editable Microsoft Word (.docx) format
- Compliant with Australian WHS requirements
- Fast turnaround — typically within 1 business day
- Digital access through JobsiteGo (included with purchase total over $797)
$129.00
GST Included
Secure Checkout
100% Australian Owned
24hr Support
Secure Checkout
100% Australian Owned
24hr Support
Termination & Removal of Existing Services SWMS is an editable Microsoft Word Safe Work Method Statement for Australian construction projects involving service isolation, gas purging, pipe removal and demolition preparation. Designed for site-specific review and customisation before work begins.
Australian Compliant
Prepared in accordance with Safe Work guidelines and relevant Australian Standards.
Product Description
Termination & Removal of Existing Services SWMS is a professionally developed Safe Work Method Statement for Australian plumbing and construction contractors undertaking the safe isolation, disconnection and removal of existing plumbing and gas services during demolition, refurbishment and redevelopment projects. Supplied in editable Microsoft Word format, this document helps businesses plan, communicate and document safe work procedures while supporting straightforward site-specific customisation before work begins.
Removing existing services requires careful planning to ensure water, gas and associated systems are correctly identified, isolated and made safe before any pipework, fixtures or fittings are disconnected. Activities may involve working with live service risks, gas purging, pipe freezing equipment, manual handling and the use of power, battery and hand tools. This SWMS provides a structured framework for managing these hazards while maintaining consistent WHS documentation throughout the removal process.
Suitable for residential, commercial and industrial projects, the document supports contractors from initial planning and service isolation through to pipe removal, waste management and final housekeeping, helping businesses implement practical safety controls while adapting the document to suit individual project requirements.
Typical Applications
Suitable for projects involving:
- Termination of existing plumbing services.
- Removal of redundant pipework.
- Demolition preparation.
- Commercial refurbishments.
- Building alterations.
- Plumbing upgrades.
- Gas service removal.
- Water service isolation.
- Fixture and fitting removal.
Work Activities Covered
Depending on the selected work method, the SWMS may include:
- Site assessment and access planning.
- Isolation of existing services.
- Lock-out and tagging of isolation points.
- Verification of service isolation.
- Isolation and purging of gas services.
- Use of pipe freezing equipment where applicable.
- Electrical bridging of metallic pipework where required.
- Disconnection and removal of pipework, fixtures and fittings.
- Manual handling of redundant materials.
- Waste removal and housekeeping.
Hazards Addressed
This SWMS addresses hazards commonly associated with terminating and removing existing services, including:
- Live services.
- Flooding.
- Fire and explosion.
- Gas release.
- Electrocution.
- Manual handling injuries.
- Sprains and strains.
- Dust inhalation.
- Eye injuries.
- Cuts and abrasions.
- Burns from pipe freezing equipment.
- Slips, trips and falls.
- Property and environmental damage.
Control Measures Included
The document assists businesses by documenting practical control measures such as:
- Identifying and isolating all relevant services before commencing work.
- Applying Do Not Operate tags to isolation valves.
- Verifying service isolation before cutting or disconnecting pipework.
- Purging gas lines with nitrogen where applicable while controlling ignition sources.
- Using competent personnel during gas purging activities.
- Barricading work areas when pipe freezing equipment is in use.
- Installing electrical bridging leads on metallic pipelines where required before disconnection.
- Applying safe manual handling techniques and using mechanical lifting equipment where practicable.
- Maintaining adequate ventilation when removing existing services and using power tools.
- Keeping work areas clean and assuming services remain live until confirmed otherwise.
Plant & Equipment
Depending on the selected work method, plant and equipment may include:
- Power tools.
- Battery tools.
- Hand tools.
- Pipe freezing equipment where applicable.
- Mechanical lifting devices where applicable.
Personal Protective Equipment
PPE requirements should be selected to suit the specific task and site conditions. Additional project-specific PPE may be required depending on the services being isolated, removed or made safe.
Document Features
- Fully editable Microsoft Word format.
- Suitable for Australian plumbing and construction projects.
- Logical work sequence from planning through completion.
- Hazard identification and practical control measures.
- Worker responsibilities and competency requirements.
- Easy to customise for individual projects and site conditions.
- Suitable for integration into broader WHS management systems.
Who This SWMS Is For
Suitable for:
- Licensed plumbers.
- Gas fitters.
- Plumbing contractors.
- Commercial maintenance contractors.
- Demolition contractors.
- Principal contractors coordinating service removal works.
Australian WHS Requirements
Termination and removal of existing services should be reviewed before work commences to ensure the SWMS reflects the planned work methods, isolation procedures, service types, equipment and project-specific hazards. Additional controls may be required where gas services, live infrastructure or specialised isolation methods are involved.
Why Choose Tradies Compliance?
Tradies Compliance develops professionally written SWMS templates that are practical, easy to customise and suitable for Australian construction businesses. Delivered in editable Microsoft Word format, our documents help streamline project preparation while supporting consistent WHS management for plumbing alterations, service isolation and demolition preparation.
✔ Editable Microsoft Word (.docx)
✔ Professionally customised
✔ Your company logo
✔ Business detail
✔ Unlimited edits
✔ Lifetime updates
✔ Risk assessment
✔ Safe work procedures
✔ PPE requirements
✔ Emergency procedures
✔ Review section
✔ Signature page
Digital Access through JobsiteGo
Businesses spending over $797 annually receive complimentary access to JobsiteGo, allowing your customised SWMS library to be securely stored, managed and accessed online.
Online access
Mobile friendly
Cloud storage
How long does customisation take?
Usually under 24 hours. Provisions can be made if you need them faster.
Can you add our logo?
Yes! At checkout you will have the opportunity to send us your logo.
Is the SWMS editable?
Yes – your SWMS comes in Word format for easy editing.
Can I order multiple SWMS?
Yes. You can order as many SWMS as you require.
Are there discounts for multiple purchases?
Yes. The more you order, the more discount you receive. Discounts are applied at checkout.
Document Type
Safe Work Method Statement
Customisation
Included
Turnaround
Within 1 Business Day
Digital Access
Through JobsiteGo
100% Australian Owned
Proudly supporting Australian businesses and jobs.
