Skid Steer & Tipper Operation SWMS
Professionally Customised for Your Business
- Professionally customised for your business
- Your Logo and Business Details Included
- Editable Microsoft Word (.docx) format
- Compliant with Australian WHS requirements
- Fast turnaround — typically within 1 business day
- Digital access through JobsiteGo (included with purchase total over $797)
$129.00
GST Included
Secure Checkout
100% Australian Owned
24hr Support
Secure Checkout
100% Australian Owned
24hr Support
Australian Compliant
Prepared in accordance with Safe Work guidelines and relevant Australian Standards.
Product Description
Operating skid steers and tipper trucks is a common part of demolition, civil and construction projects, requiring careful coordination to safely move, load and transport materials while managing mobile plant risks. The Skid Steer & Tipper Operation SWMS is intended for demolition contractors, civil contractors, construction businesses and principal contractors undertaking material handling and load-out activities using skid steers and tipper trucks. It helps construction businesses safely plan, manage and document these operations while supporting site-specific risk management and Australian WHS requirements.
Skid steers are versatile machines used for excavation, stockpiling, loading, levelling and material handling, while tipper trucks transport demolition waste, spoil and construction materials from site. These activities require competent operators, effective traffic management, separation of plant and pedestrians, routine plant inspections and careful management of ground conditions to reduce the risk of collisions, rollovers and load instability.
This SWMS follows the documented work sequence from pre-start inspections and equipment setup through to skid steer operation, loading tipper trucks, transporting materials, refuelling and end-of-shift housekeeping. It provides a practical framework that can be reviewed and customised to suit individual projects and workplace conditions.
Activities Covered
- Conducting pre-start inspections and plant checks.
- Operating skid steers for excavation, loading and material handling.
- Travelling safely around construction and demolition sites.
- Changing and using approved attachments.
- Loading tipper trucks with demolition and excavated materials.
- Operating tipper trucks for material transport and unloading.
- Refuelling, maintenance and housekeeping.
Hazards Addressed
- Mobile plant collisions and pedestrian interaction.
- Plant rollover and overturning.
- Crush injuries and moving machinery.
- Contact with underground and overhead services.
- Falling objects and unstable loads.
- Manual handling and slips, trips and falls.
- Noise, dust and refuelling hazards.
Control Measures Included
- Daily pre-start inspections and routine plant maintenance.
- Traffic management plans, exclusion zones and designated travel routes.
- Separation of pedestrians from operating plant.
- Reverse alarms, amber beacons and spotters where required.
- Dial Before You Dig and service identification before excavation.
- Safe loading, tipping and load restraint procedures.
- Refuelling in designated areas with spill management and housekeeping controls.
PPE Requirements
The source document specifies PPE including:
- High-visibility clothing.
- Safety footwear.
Additional PPE may include:
- Hard hat.
- Gloves.
- Eye protection.
- Hearing protection.
- Dust mask.
depending on the work activity and site-specific requirements.
Plant and Equipment
Plant and equipment may include:
- Skid steer (Bobcat).
- Skid steer attachments.
- Tipper truck.
- Hand tools.
- Traffic control equipment.
Additional attachments may include pallet forks, augers, trenchers, sweepers, hammers, levelling attachments and buckets where applicable.
Hazardous Chemicals
Where applicable, work may involve:
- Diesel fuel.
- Hydraulic oil.
- Engine oil.
- Transmission fluids.
Hazardous substances should be managed in accordance with Safety Data Sheets and project-specific procedures.
Emergency Planning
The SWMS includes emergency response procedures for plant incidents, collisions, utility strikes, fire, refuelling incidents and other workplace emergencies. Emergency arrangements should be reviewed and customised to suit the workplace and project before work commences.
What’s Included
This editable Microsoft Word SWMS may include:
- Sequential work activities.
- Hazard identification and risk controls.
- PPE requirements.
- Plant and equipment guidance.
- Emergency response procedures.
- Legislative references.
- Worker consultation and sign-off records.
- Plant inspection and maintenance requirements.
Who This SWMS Is For
Suitable for:
- Demolition contractors.
- Civil contractors.
- Construction contractors.
- Earthmoving contractors.
- Principal contractors coordinating mobile plant operations.
Australian WHS Requirements
The source document references applicable Australian WHS legislation together with Codes of Practice relating to managing the risk of plant, excavation work, hazardous manual tasks, moving plant on construction sites, managing noise, working near overhead powerlines and workplace consultation. Every SWMS should be reviewed and customised to reflect the workplace, plant configuration, traffic management arrangements and site-specific hazards before work commences.
Why Choose Tradies Compliance?
Tradies Compliance SWMS documents are developed to help construction businesses implement practical, professional safety documentation for mobile plant and material handling operations. Delivered in an editable Microsoft Word format, they can be customised to suit individual projects while supporting consistent planning, supervision and safe operation of skid steers and tipper trucks.
✔ Editable Microsoft Word (.docx)
✔ Professionally customised
✔ Your company logo
✔ Business detail
✔ Unlimited edits
✔ Lifetime updates
✔ Risk assessment
✔ Safe work procedures
✔ PPE requirements
✔ Emergency procedures
✔ Review section
✔ Signature page
Digital Access through JobsiteGo
Businesses spending over $797 annually receive complimentary access to JobsiteGo, allowing your customised SWMS library to be securely stored, managed and accessed online.
Online access
Mobile friendly
Cloud storage
How long does customisation take?
Usually under 24 hours. Provisions can be made if you need them faster.
Can you add our logo?
Yes! At checkout you will have the opportunity to send us your logo.
Is the SWMS editable?
Yes – your SWMS comes in Word format for easy editing.
Can I order multiple SWMS?
Yes. You can order as many SWMS as you require.
Are there discounts for multiple purchases?
Yes. The more you order, the more discount you receive. Discounts are applied at checkout.
Document Type
Safe Work Method Statement
Customisation
Included
Turnaround
Within 1 Business Day
Digital Access
Through JobsiteGo
100% Australian Owned
Proudly supporting Australian businesses and jobs.
