Redundant Diesel Tank Removal SWMS
Professionally Customised for Your Business
- Professionally customised for your business
- Your Logo and Business Details Included
- Editable Microsoft Word (.docx) format
- Compliant with Australian WHS requirements
- Fast turnaround — typically within 1 business day
- Digital access through JobsiteGo (included with purchase total over $797)
$129.00
GST Included
Secure Checkout
100% Australian Owned
24hr Support
Secure Checkout
100% Australian Owned
24hr Support
Australian Compliant
Prepared in accordance with Safe Work guidelines and relevant Australian Standards.
Product Description
Removing a redundant diesel storage tank requires careful planning to safely manage residual fuel, flammable vapours, excavation hazards, lifting operations and environmental risks. The Redundant Diesel Tank Removal SWMS is intended for demolition contractors, civil contractors, construction businesses and principal contractors undertaking the decommissioning and removal of above-ground or underground diesel storage tanks. It helps construction businesses safely plan, manage and document tank removal activities while supporting site-specific risk management and Australian WHS compliance requirements.
Diesel tank removal typically involves exposing the tank, isolating connected services, draining remaining fuel, venting residual vapours, rigging and lifting the tank before reinstating or remediating the work area. These activities require careful coordination to minimise the risk of fire, explosion, environmental contamination and injuries associated with excavation and lifting operations.
This SWMS follows the documented work sequence from site preparation through to final clean-up, providing a practical framework that can be reviewed and customised to suit individual project requirements.
Activities Covered
- Site preparation and pre-start inspections.
- Locating underground services.
- Establishing exclusion zones.
- Saw cutting and removing concrete pit slabs.
- Isolating connected pumps and services.
- Draining residual diesel from the tank.
- Venting the tank to release residual vapours.
- Rigging and lifting the tank using approved lifting equipment.
- Soil and sand removal where required.
- Stockpiling materials.
- Site clean-up and completion.
Hazards Addressed
The documented work activity addresses hazards that may include:
- Residual diesel fuel and fuel leaks.
- Flammable vapours.
- Fire and explosion risks.
- Excavation hazards.
- Contact with underground services.
- Silica dust generated during concrete cutting.
- Mobile plant and lifting operations.
- Suspended loads.
- Manual handling injuries.
- Environmental contamination.
- Slips, trips and falls.
Control Measures Included
Depending on the selected work method and project requirements, the SWMS outlines controls such as:
- Identification of underground services before excavation.
- Establishment of exclusion zones around excavation and lifting areas.
- Isolation of pumps and connected services.
- Controlled draining of residual diesel into approved containers.
- Venting procedures before tank handling.
- Spill kits and fire extinguishers available onsite.
- Use of rated lifting equipment and competent operators.
- Controlled lifting and placement of tanks.
- Segregation of contaminated materials where applicable.
- Dust suppression and housekeeping procedures.
PPE Requirements
The source document specifies PPE including:
- Hard hat.
- High-visibility clothing.
- Safety footwear.
- Gloves.
- Eye protection.
- Hearing protection.
Additional PPE may be required depending on the presence of contaminated materials, diesel residues and site-specific hazards.
Plant and Equipment
Plant and equipment may include:
- Excavator.
- Tipper truck.
- Concrete saw or quick-cut saw.
- Reciprocating saw.
- Rated slings and shackles.
- Tag lines.
- Hand tools.
- Spill response equipment.
- Fire extinguishers.
Hazardous Chemicals
Where applicable, the work may involve:
- Diesel fuel.
- Residual hydrocarbons.
- Contaminated soil.
- Fuel residues.
Hazardous substances should be managed in accordance with Safety Data Sheets, environmental requirements and project-specific procedures.
Emergency Planning
The SWMS includes emergency response procedures for medical emergencies, utility strikes, electric shock, fire, explosion and the unexpected discovery of asbestos-containing materials, together with reporting and communication requirements.
What’s Included
This editable Microsoft Word SWMS may include:
- Sequential work activities.
- Hazard identification and control measures.
- PPE requirements.
- Plant and equipment guidance.
- Emergency response procedures.
- Worker responsibilities.
- Legislative references.
- Consultation and worker sign-off records.
Who This SWMS Is For
Suitable for:
- Demolition contractors.
- Civil contractors.
- Fuel infrastructure contractors.
- Construction businesses removing redundant fuel storage tanks.
- Principal contractors coordinating demolition and remediation works.
Australian WHS Requirements
The source document references applicable Australian WHS legislation, environmental legislation and Codes of Practice relating to hazardous chemicals, excavation work, plant, workplace risk management and first aid. Every SWMS should be reviewed and customised to reflect the actual workplace, environmental requirements, equipment and work methods before work commences.
Why Choose Tradies Compliance?
Tradies Compliance SWMS documents are developed to help construction businesses implement professional, practical safety documentation for high-risk demolition and infrastructure works. Delivered in an editable Microsoft Word format, they can be customised for individual projects while supporting consistent planning, supervision and safe work practices.
✔ Editable Microsoft Word (.docx)
✔ Professionally customised
✔ Your company logo
✔ Business detail
✔ Unlimited edits
✔ Lifetime updates
✔ Risk assessment
✔ Safe work procedures
✔ PPE requirements
✔ Emergency procedures
✔ Review section
✔ Signature page
Digital Access through JobsiteGo
Businesses spending over $797 annually receive complimentary access to JobsiteGo, allowing your customised SWMS library to be securely stored, managed and accessed online.
Online access
Mobile friendly
Cloud storage
How long does customisation take?
Usually under 24 hours. Provisions can be made if you need them faster.
Can you add our logo?
Yes! At checkout you will have the opportunity to send us your logo.
Is the SWMS editable?
Yes – your SWMS comes in Word format for easy editing.
Can I order multiple SWMS?
Yes. You can order as many SWMS as you require.
Are there discounts for multiple purchases?
Yes. The more you order, the more discount you receive. Discounts are applied at checkout.
Document Type
Safe Work Method Statement
Customisation
Included
Turnaround
Within 1 Business Day
Digital Access
Through JobsiteGo
100% Australian Owned
Proudly supporting Australian businesses and jobs.