Excavator Operation SWMS
Professionally Customised for Your Business
- Professionally customised for your business
- Your Logo and Business Details Included
- Editable Microsoft Word (.docx) format
- Compliant with Australian WHS requirements
- Fast turnaround — typically within 1 business day
- Digital access through JobsiteGo (included with purchase total over $797)
$129.00
GST Included
Secure Checkout
100% Australian Owned
24hr Support
Secure Checkout
100% Australian Owned
24hr Support
Australian Compliant
Prepared in accordance with Safe Work guidelines and relevant Australian Standards.
Product Description
Operating an excavator on construction, civil, demolition and infrastructure projects requires careful planning to manage plant movement, excavation activities, lifting operations and interaction with surrounding workers. Excavator Operation SWMS is written for Australian construction businesses using excavators for earthworks, demolition support, material handling and general site operations. It helps businesses safely plan, manage and document excavator activities while supporting compliance with Australian WHS requirements through site-specific risk assessment and implementation.
This Safe Work Method Statement follows the documented work sequence from pre-start planning and site induction through to machine operation, excavation work, attachment changes, lifting activities, refuelling, maintenance and shutdown procedures. The document addresses the practical controls required to safely operate powered mobile plant while reducing risks to operators, nearby workers and the public.
Excavators are used across a wide range of construction activities, often working alongside pedestrians, other mobile plant and underground services. This SWMS supports safe coordination of these activities by documenting practical control measures that can be reviewed and adapted to suit individual projects and changing site conditions.
Activities Covered
- Excavator pre-start inspections.
- Site setup and work area assessment.
- Operation of excavators on construction sites.
- Excavation and earthmoving activities.
- Working around underground and overhead services.
- Operation with hammer attachments where applicable.
- Changing excavator attachments.
- Excavator lifting activities using approved lifting devices where applicable.
- Safe travelling on site.
- Refuelling, maintenance and servicing.
- Shutdown and housekeeping.
Hazards Addressed
- Mobile plant movement.
- Collision with people and other plant.
- Crush injuries.
- Rollovers.
- Falling objects.
- Excavation collapse and unstable ground.
- Underground and overhead services.
- Manual handling.
- Slips, trips and falls.
- Excessive noise.
- Hydraulic hazards.
- Fire and explosion during refuelling.
- Lifting operations.
Control Measures Included
The documented controls may include:
- Daily pre-start inspections.
- Site inductions and SWMS review.
- Exclusion zones and barricading.
- Traffic management controls.
- Spotters where required.
- Dial Before You Dig planning.
- Safe separation of plant and personnel.
- Excavation support measures where applicable.
- Machine inspection and maintenance requirements.
- Safe attachment change procedures.
- Refuelling and maintenance controls.
- Manufacturer operating requirements.
PPE Requirements
The source document identifies PPE that may include:
- Hard hat.
- High-visibility clothing.
- Safety footwear.
- Gloves.
- Safety glasses.
- Hearing protection.
- Sunscreen.
- Sun hat.
Additional PPE may be required depending on site-specific hazards and project requirements.
Plant and Equipment
Plant and equipment may include:
- Excavator.
- Hammer attachment.
- Auger.
- Shears.
- Ripper.
- Buckets.
- Grabs.
- Land rakes.
- Whacker plate.
- Approved lifting gear where applicable.
Supporting equipment should always be selected to suit the work method and manufacturer’s operating requirements.
Hazardous Chemicals
The source document lists hazardous chemicals that may include:
- Diesel.
- Unleaded fuel.
- Hydraulic oil.
These materials should be managed in accordance with Safety Data Sheets and site-specific procedures.
Emergency and Operational Considerations
The SWMS documents controls for operating powered mobile plant in active construction environments, including interaction with other vehicles, underground services, lifting operations, excavation support, refuelling and maintenance activities. It also documents controls for safe operation of specialised attachments, travelling on uneven ground and maintaining exclusion zones around operating machinery.
What’s Included
Delivered in editable Microsoft Word format, this SWMS may include:
- Sequential work activities.
- Hazard identification.
- Risk control measures.
- PPE requirements.
- Plant and equipment guidance.
- Excavation controls.
- Mobile plant safety procedures.
- Inspection requirements.
- Legislative references.
- Worker consultation and sign-off records.
Who This SWMS Is For
Suitable for:
- Excavator operators.
- Earthmoving contractors.
- Civil contractors.
- Demolition contractors.
- Construction businesses.
- Principal contractors coordinating mobile plant activities.
Australian WHS Requirements
The source document references Australian WHS legislation and Codes of Practice including the WHS Act, WHS Regulations, Hazardous Manual Tasks Code of Practice, How to Manage WHS Risks Code of Practice, Managing the Risk of Plant Code of Practice and Moving Plant on Construction Sites guidance. Every SWMS should be reviewed and customised before work commences to reflect the workplace, excavation methodology and project-specific hazards.
✔ Editable Microsoft Word (.docx)
✔ Professionally customised
✔ Your company logo
✔ Business detail
✔ Unlimited edits
✔ Lifetime updates
✔ Risk assessment
✔ Safe work procedures
✔ PPE requirements
✔ Emergency procedures
✔ Review section
✔ Signature page
Digital Access through JobsiteGo
Businesses spending over $797 annually receive complimentary access to JobsiteGo, allowing your customised SWMS library to be securely stored, managed and accessed online.
Online access
Mobile friendly
Cloud storage
How long does customisation take?
Usually under 24 hours. Provisions can be made if you need them faster.
Can you add our logo?
Yes! At checkout you will have the opportunity to send us your logo.
Is the SWMS editable?
Yes – your SWMS comes in Word format for easy editing.
Can I order multiple SWMS?
Yes. You can order as many SWMS as you require.
Are there discounts for multiple purchases?
Yes. The more you order, the more discount you receive. Discounts are applied at checkout.
Document Type
Safe Work Method Statement
Customisation
Included
Turnaround
Within 1 Business Day
Digital Access
Through JobsiteGo
100% Australian Owned
Proudly supporting Australian businesses and jobs.