Removal of Metering Equipment SWMS is an editable Microsoft Word Safe Work Method Statement for Australian electrical projects involving electricity meter removal, electrical isolation, verification testing and safe decommissioning of metering equipment. Designed for site-specific review and customisation before work begins.
SWMS Package Discount

Australian Compliant

Prepared in accordance with Safe Work guidelines and relevant Australian Standards.

Product Description

Removal of Metering Equipment SWMS is a professionally developed Safe Work Method Statement for Australian licensed electrical contractors undertaking the safe removal of electricity metering equipment from residential, commercial and industrial installations. Supplied in editable Microsoft Word format, this document helps businesses plan, communicate and document safe work procedures while supporting straightforward site-specific customisation before work begins.

Removing electricity metering equipment requires careful planning, strict electrical isolation procedures and detailed verification testing to minimise the risks associated with energised electrical installations. Contractors may also encounter asbestos-containing meter panels, customer outages, switchboard hazards and metering provider requirements throughout the removal process. This SWMS provides a structured framework covering the complete work sequence from planning and obtaining approvals through testing, meter removal, securing the installation and completing project documentation.

Suitable for residential, commercial, industrial and utility metering projects, this document assists contractors in implementing practical risk controls while maintaining consistent WHS documentation for electricity metering removal work.

Typical Applications

Suitable for projects involving:

  • Electricity meter removal.
  • Metering equipment removal.
  • Meter replacement projects.
  • Electrical service alterations.
  • Metering upgrades.
  • Switchboard metering works.
  • Permanent disconnections.
  • Commercial electrical projects.
  • Residential electrical installations.

Work Activities Covered

Depending on the selected work method, the SWMS may include:

  • Workplace risk assessment and securing the work area.
  • Confirming approvals and permissions for metering removal.
  • Notifying property controllers and occupants of planned outages.
  • Installing an independent earth.
  • Testing switchboard surrounds for energisation.
  • Identifying asbestos-containing switchboard materials where applicable.
  • Recording meter readings before removal.
  • Polarity, phase rotation and neutral supply testing.
  • Isolating electrical supply and confirming de-energisation.
  • Disconnecting and removing metering equipment.
  • Leaving the installation in a safe condition.
  • Reinstating seals and securing switchboards.
  • Completing documentation and site handover.

Hazards Addressed

This SWMS addresses hazards commonly associated with metering removal, including:

  • Electric shock.
  • Arc flash.
  • Energised electrical installations.
  • Inadvertent energisation.
  • Asbestos exposure.
  • Manual handling injuries.
  • Damage to underground services.
  • Hand injuries.
  • Unauthorised access to electrical equipment.
  • Slips, trips and falls.

Control Measures Included

The document assists businesses by documenting practical control measures such as:

  • Completing site-specific risk assessments and securing the work area before commencing work.
  • Confirming metering provider approvals and required outage arrangements before disconnecting supply.
  • Establishing exclusion zones, barricades and warning signage where required.
  • Installing an independent earth and conducting testing using appropriately rated CAT IV instruments.
  • Applying “test before you touch” and prove de-energised procedures before disconnecting equipment.
  • Identifying asbestos-containing meter panels and implementing approved asbestos management controls where applicable.
  • Recording meter readings before de-energising and removing equipment.
  • Performing polarity, phase rotation and neutral supply testing before removal.
  • Removing or insulating disconnected conductors and leaving the installation in a safe condition.
  • Completing required notifications, compliance documentation and securing switchboards before leaving the site.

Plant & Equipment

Depending on the selected work method, plant and equipment may include:

  • Hand tools.
  • Power tools.
  • Electrical tools.
  • Electrical leads.
  • CAT IV test instruments.
  • Insulated mat.
  • Rescue kit.

Personal Protective Equipment

The documented activity references PPE including:

  • Hard hat.
  • High-visibility clothing.
  • Safety boots.
  • Safety glasses.
  • Insulating gloves.
  • Face shield.
  • Protective coveralls.

Document Features

  • Fully editable Microsoft Word format.
  • Suitable for Australian residential, commercial and industrial electrical projects.
  • Logical work sequence from planning through completion.
  • Hazard identification and practical control measures.
  • Worker responsibilities and competency requirements.
  • Easy to customise for individual projects and site conditions.
  • Suitable for integration into broader WHS management systems.

Who This SWMS Is For

Suitable for:

  • Licensed electricians.
  • Metering providers.
  • Electrical contractors.
  • Commercial electrical contractors.
  • Industrial electrical contractors.
  • Principal contractors coordinating electrical metering works.

Australian WHS Requirements

Metering removal activities should be reviewed before work commences to ensure the SWMS reflects the planned removal methods, electrical isolation procedures, testing requirements, metering provider approvals and asbestos management requirements where applicable. The source document specifies that metering removal, isolation, testing and energisation work must be performed by a qualified licensed electrician, with voltage testing undertaken by competent persons and a Safety Observer or rescuer present where required. Additional controls may be necessary where asbestos-containing meter panels are identified.

Why Choose Tradies Compliance?

Tradies Compliance develops professionally written SWMS templates that are practical, easy to customise and suitable for Australian electrical businesses. Delivered in editable Microsoft Word format, our documents help streamline project preparation while supporting consistent WHS management for electricity metering, electrical testing, isolation procedures and compliance activities.

✔  Editable Microsoft Word (.docx)
✔  Professionally customised
✔  Your company logo
✔  Business detail
✔  Unlimited edits
✔  Lifetime updates

✔  Risk assessment
✔  Safe work procedures
✔  PPE requirements
✔  Emergency procedures
✔  Review section
✔  Signature page

Digital Access through JobsiteGo

Businesses spending over $797 annually receive complimentary access to JobsiteGo, allowing your customised SWMS library to be securely stored, managed and accessed online.

Online access

Mobile friendly

Cloud storage

How long does customisation take?

Usually under 24 hours. Provisions can be made if you need them faster.

Yes! At checkout you will have the opportunity to send us your logo.

Yes – your SWMS comes in Word format for easy editing.

Yes. You can order as many SWMS as you require.

Yes. The more you order, the more discount you receive. Discounts are applied at checkout.

Document Type

Safe Work Method Statement

Customisation

Included

Turnaround

Within 1 Business Day

Digital Access

Through JobsiteGo

100% Australian Owned

Proudly supporting Australian businesses and jobs.

Scroll to Top