Installation of Metering Equipment SWMS
Professionally Customised for Your Business
- Professionally customised for your business
- Your Logo and Business Details Included
- Editable Microsoft Word (.docx) format
- Compliant with Australian WHS requirements
- Fast turnaround — typically within 1 business day
- Digital access through JobsiteGo (included with purchase total over $797)
$129.00
GST Included
Secure Checkout
100% Australian Owned
24hr Support
Secure Checkout
100% Australian Owned
24hr Support
Australian Compliant
Prepared in accordance with Safe Work guidelines and relevant Australian Standards.
Product Description
Installation of Metering Equipment SWMS is a professionally developed Safe Work Method Statement for Australian licensed electrical contractors undertaking the installation, replacement, testing and commissioning of electricity metering equipment. Supplied in editable Microsoft Word format, this document helps businesses plan, communicate and document safe work procedures while supporting straightforward site-specific customisation before work begins.
Metering installation involves working on or near electrical installations where effective planning, electrical isolation, verification testing and strict work procedures are essential. Contractors may also encounter asbestos-containing switchboards, energised equipment, arc flash hazards and complex testing requirements throughout the installation process. This SWMS provides a structured framework covering the complete work sequence from pre-start planning and approvals through metering installation, testing, commissioning and project close-out.
Suitable for residential, commercial, industrial and utility metering projects, this document assists contractors in implementing practical risk controls while maintaining consistent WHS documentation for electricity metering work.
Typical Applications
Suitable for projects involving:
- Electricity metering installation.
- Meter replacement.
- Smart meter installation.
- Meter upgrades.
- Meter commissioning.
- Switchboard metering works.
- Electrical service upgrades.
- Commercial electrical projects.
- Residential electrical installations.
Work Activities Covered
Depending on the selected work method, the SWMS may include:
- Workplace risk assessment and site preparation.
- Obtaining permissions and confirming connection requirements.
- Notifying property controllers and occupants of planned outages.
- Installing an independent earth.
- Testing switchboard surrounds for energisation.
- Identifying asbestos-containing switchboard materials where applicable.
- Electrical isolation and proving de-energisation.
- Installing and mounting metering equipment.
- Wiring meters and associated components.
- Insulation resistance, polarity and phase rotation testing.
- Neutral supply testing.
- Meter commissioning.
- Reinstating seals and securing switchboards.
- Final documentation and site handover.
Hazards Addressed
This SWMS addresses hazards commonly associated with metering installation, including:
- Electric shock.
- Arc flash.
- Energised electrical installations.
- Inadvertent energisation.
- Asbestos exposure.
- Manual handling injuries.
- Underground service damage.
- Hand injuries.
- Unauthorised access to electrical equipment.
- Slips, trips and falls.
Control Measures Included
The document assists businesses by documenting practical control measures such as:
- Completing site-specific risk assessments before commencing work.
- Confirming required permissions and outage arrangements before connecting or disconnecting metering.
- Establishing exclusion zones, barricades and warning signage where required.
- Using approved electrical isolation procedures and confirming installations are de-energised before work begins.
- Applying “test before you touch” principles using appropriately rated CAT IV test equipment.
- Standing on insulated mats and wearing electrically rated PPE throughout live testing activities.
- Providing a competent Safety Observer or rescuer where required by the work conditions.
- Identifying asbestos-containing switchboards and implementing approved asbestos management controls where applicable.
- Completing insulation resistance, polarity, phase rotation and neutral supply testing before commissioning.
- Confirming labelling, securing switchboards and completing all required documentation before project completion.
Plant & Equipment
Depending on the selected work method, plant and equipment may include:
- Hand tools.
- Power tools.
- Electrical tools.
- Electrical leads.
- Insulated mat.
- Rescue kit.
Personal Protective Equipment
The documented activity references PPE including:
- Hard hat.
- High-visibility clothing.
- Safety boots.
- Safety glasses.
- Gloves.
- Face shield.
- Protective coveralls.
Document Features
- Fully editable Microsoft Word format.
- Suitable for Australian residential, commercial and industrial electrical projects.
- Logical work sequence from planning through completion.
- Hazard identification and practical control measures.
- Worker responsibilities and competency requirements.
- Easy to customise for individual projects and site conditions.
- Suitable for integration into broader WHS management systems.
Who This SWMS Is For
Suitable for:
- Licensed electricians.
- Metering providers.
- Electrical contractors.
- Commercial electrical contractors.
- Industrial electrical contractors.
- Principal contractors coordinating electrical metering works.
Australian WHS Requirements
Metering installation activities should be reviewed before work commences to ensure the SWMS reflects the planned installation methods, electrical isolation procedures, testing requirements, asbestos management requirements where applicable and project-specific hazards. Additional controls may be required where work is undertaken on or near energised electrical installations or asbestos-containing switchboards.
Why Choose Tradies Compliance?
Tradies Compliance develops professionally written SWMS templates that are practical, easy to customise and suitable for Australian electrical businesses. Delivered in editable Microsoft Word format, our documents help streamline project preparation while supporting consistent WHS management for metering installation, electrical testing, commissioning and compliance activities.
✔ Editable Microsoft Word (.docx)
✔ Professionally customised
✔ Your company logo
✔ Business detail
✔ Unlimited edits
✔ Lifetime updates
✔ Risk assessment
✔ Safe work procedures
✔ PPE requirements
✔ Emergency procedures
✔ Review section
✔ Signature page
Digital Access through JobsiteGo
Businesses spending over $797 annually receive complimentary access to JobsiteGo, allowing your customised SWMS library to be securely stored, managed and accessed online.
Online access
Mobile friendly
Cloud storage
How long does customisation take?
Usually under 24 hours. Provisions can be made if you need them faster.
Can you add our logo?
Yes! At checkout you will have the opportunity to send us your logo.
Is the SWMS editable?
Yes – your SWMS comes in Word format for easy editing.
Can I order multiple SWMS?
Yes. You can order as many SWMS as you require.
Are there discounts for multiple purchases?
Yes. The more you order, the more discount you receive. Discounts are applied at checkout.
Document Type
Safe Work Method Statement
Customisation
Included
Turnaround
Within 1 Business Day
Digital Access
Through JobsiteGo
100% Australian Owned
Proudly supporting Australian businesses and jobs.
